Today we removed the service lights and vacuumed the inside of the hull, did a count of the the tools in our three tool boxes and inspected the hull one last time from the inside. We are done with the internal structural inspection and are now ready to refill the hull with the helium stored in the three 2300 cubic meter storage bags. Tomorrow the helium will be pumped from the storage bags into the envelope, next step is to purify the helium and remove the service support structure.
-- Matthew
No comments:
Post a Comment